Stormvello

Roof replacement in the Des Moines metro

We strip the old roof to the deck, fix what we find and install a complete new system, usually in one day. You get a written estimate first and a 10-year workmanship warranty after.

A roof is a system, not just shingles

Underlayment, flashing, vents and the wood deck all work together to keep water out and let the attic breathe. When one part wears out, the others pick up the slack for a while. The first sign you notice is often a ceiling stain, long after the damage started.

In central Iowa, architectural shingles usually last about 18 to 25 years. Hail, poor attic ventilation and freeze-thaw cycles all shorten that. If your roof is in that range or has been through a few hard storms, it pays to know where it stands before a leak makes the decision for you.

Signs it's time for a new roof

One of these on its own may only need a repair. Several together usually mean the roof is near the end of its life.

  • Granules in the guttersShingles shed their protective granules as they age. Heavy buildup at the downspouts, or dark bare patches on the roof, means the asphalt is exposed to the sun.
  • Curling, cupping or crackingEdges that curl up or tabs that crack across have dried out. They lift easily in wind and let water under.
  • New leaks in different spotsOne leak is a repair. New leaks every season, in different places, point to a roof that is failing as a whole.
  • Sagging or soft spotsA dip along the roofline or decking that feels spongy underfoot usually means wet or rotten wood, and it should be fixed before winter snow loads.
  • Hail bruising on several slopesHail that breaks the shingle mat shortens the roof's life even before anything leaks. That's often an insurance matter, so start with a free inspection.

Why we tear off instead of layering over

Building codes in Iowa allow up to two layers of shingles, so nailing a new roof over the old one is legal on many homes and cheaper up front. If your house already has two layers, a tear-off isn't optional.

We recommend a full tear-off on nearly every job anyway. With the old roof off, we can see and walk the bare deck, and rotten boards or old leak damage get fixed instead of buried. New shingles also lie flat and seal properly on a clean deck, and your framing doesn't carry the weight of a second layer.

Roofing crew replacing the shingle roof on a two-story brick house, ladders against the walls

What every replacement includes

  • Full tear-offOld shingles, underlayment and flashing come off down to the deck. Tarps protect landscaping, siding and windows while we work.
  • Deck inspection and board replacementWe walk the bare deck and replace rotten or delaminated boards, and photograph what we replaced so you can see why.
  • Ice and water shieldA self-sealing membrane goes along the eaves and in every valley, where ice dams and heavy runoff do the most damage. At the eaves it runs at least 24 inches past the inside of the exterior wall.
  • Synthetic underlayment and drip edgeSynthetic underlayment covers the rest of the deck. New metal drip edge on the eaves and rakes steers water into the gutter instead of behind it.
  • New flashing and pipe bootsWall, step and chimney flashing and every pipe boot are replaced, not reused. These are where most leaks start.
  • Ventilation check, cleanup and walk-throughWe check intake and exhaust and correct them if needed, run magnetic sweeps for nails across the yard and driveway, then walk the finished job with you.

Choosing a roofing material

We install shingles from major manufacturers, including Owens Corning, GAF, CertainTeed and Malarkey, plus standing seam metal. These are the options most Des Moines-area homeowners weigh.

MaterialHail resistanceTypical lifeGood fit for
3-tab asphaltLowShorter than architecturalRentals, garages, tight budgets
Architectural asphaltModerateAbout 18 to 25 yearsMost homes in the metro
Class 4 impact-resistantHigh (UL 2218 Class 4)Similar to architecturalHomes in frequent hail paths
Standing seam metalHigh; can dent cosmeticallyOften 40+ yearsLong-term owners, modern designs

Most full replacements finish in one day, weather permitting. Every one carries our 10-year workmanship warranty on top of the manufacturer's material warranty.

Questions about roof replacement

How long does a roof replacement take?

Most single-family homes are finished in one day, weather permitting. Large or steep roofs, a second layer to remove or a lot of deck repair can stretch it into a second day. If rain is in the forecast, we only tear off what we can dry in that same day.

What happens if you find rotten decking?

We replace it before anything new goes down, because shingles nailed into soft wood won't hold. Your estimate explains how deck repair is priced, so a few bad boards don't turn into a surprise on the final bill.

Is a Class 4 impact-resistant shingle worth it here?

For many homes in the metro, yes. Class 4 shingles pass the UL 2218 test, which drops a 2-inch steel ball from 20 feet onto the shingle, and they hold up better in the hail central Iowa sees most springs. Some insurers offer a premium discount for them, so ask your agent before you choose.

Will insurance pay for my new roof?

If hail or wind damaged it, it may. Age and normal wear aren't covered. Start with a free inspection, and if we find storm damage, our storm damage and claims page explains what happens next.

Do you offer financing?

Yes, through a third-party lender for qualified buyers. The lender sets the rates and terms. See financing for how to apply, or ask about it during your estimate.

Book your free inspection

Tell us what you're seeing and we'll schedule a visit, usually within a few days. You get photos and a written estimate either way, with no pressure to sign anything.

What can we help with? (choose any)

We reply within one business day. Your details stay with us, see our privacy policy.